The fire safety authorization is the procedure by which the ISU inspector performs an on-site visit at the end of the construction phase to verify the compliance of the execution. This documentation contains the specialty technical projects, the approval of the used materials (which observe the fire protection requirements), a pressure test for the extinguishing equipment, etc.